PROJECT

Swanbank Landfill Waste Disposal Facility

SECTOR

Construction

CLIENT

Swanbank Waste Management

LOCATION

Swanbank

AE Group were engaged by Swanbank Waste Management to remove spontaneous combustion material from an existing dump site after heavy rains had caused a slip onto Swanbank Road. These works were performed pursuant to the Coal Mining Act under the scrutiny of the Department of Mines and Energy and the Environmental Protection Agency. AE were appointed SSE for the project site.

Swanbank Coal Mining Project - Excavator ROM Management

Plant selected to undertake the works consisted of:

  • PC650 Komatsu excavator
  • D9T CAT dozer
  • Scania Watercart (13,000L) with high pressure fire fighting capabilities

As limited data existed on how spontaneous combustion material reacted in its own environment with different elements and exposure ratios, the Department of Mines and Energy subsequently used this work as a test case.

Specialised heat guns and gas monitoring equipment were utilised to measure the temperature and discharge of gases of the material in its natural state and throughout excavation. Material temperatures varied between 50ºC and up to 380ºC.

Risk assessments and JSEA’s were completed and updated daily due to the nature of the material and stringent handling requirements.

Continual monitoring and data collection was compiled throughout the project allowing all stakeholders to make informed decisions regarding the safety of personnel and plant. A safe and effective outcome was achieved.

View more projects

AE-Group-Stanwell-Storage-Dam
AE-Group-MMC-Haul-Road-building
AE-Group-MMC-Gully-Rehabilitation
AE-Group-MIA-Conveyor-Construction
AE-Group-PDM-Dam-Construction
Moreton Bay Regional Council AE-Group-MBRC-Amenities-Construction
AE Group Mining Services Civil Earthworks
Citiswich Premium Industrial Estate - Bulk Earthworks
Mine Site Wash Bay Facility
Deenery Gold Poultry - Infrastructure Pads, Earthworks
Bonogin QLD Residential Subdivision - Pavement Installation
Springfield-Shopping AE Group Civil Development
Radius-Industrial-Park AE Group Civil
Round-Mountain-Reservoir AE Group Civil
Gold Coast Landfill Project - Bulk Earth Moving
Baulderstone Queensland - Civil Construction of Correctional Precinct
Wivenhoe Spillway Upgrade Project - Bulk Earthworks
Burdekin to Moranbah Pipeline Project - Dam Wall Construction
Swanbank Coal Mining Project - Excavator ROM Management

Download our Capability Statement

Our Difference

Delivering Results is Our Best Plan

We look to establish lasting relationships with our employees, clients, and suppliers by exceeding their expectations and gaining their trust through exceptional integrity, performance and reliability by all members of our teams. Our clients count on our dependability, our drive to achieve and our integrity. We take great pride in our accomplishments and building on them every day.