PROJECT

Stanwell Power Stations – Ash Storage Area Stage 4 Extension

SECTOR

Construction

CLIENT

Stanwell Power Station

LOCATION

Stanwell

We decommissioned and rehabilitated the existing structure while constructing a new evaporation pond, ensuring continued ash deposition in line with Stanwell’s long-term plan and providing proper storage and disposal for ash slurry.

AE-Group-Stanwell-Storage-Dam

Challenges We Overcame:

Executing live works with a focus on safety and environmental compliance, we utilized GPS drones and LIDAR equipment for precise control over earthworks. Real-time updates and surveys facilitated prompt redesigns and minimized project downtime, despite facing numerous inclement weather delays.

Our Approach & Objectives:

By employing advanced technologies and adhering to stringent safety standards, we showcased expertise in complex civil construction. Our approach prioritized excellence, innovation, and sustainable practices,
ensuring project precision, efficiency, and environmental stewardship while surpassing client expectations.

Key Deliverables:

  • Excavation (410,000m3)
  • Clearing and grubbing (115,000m2)
  • Topsoil and stockpile management
  • Land revegetation on embankments
  • Benching and key trenching of existing extension
  • Geofabric placement with Rip Rap rock protection
  • Surface stripping: Topsoil (45,000m3) un suitable materials (35,000m3) and additional ramps
  • Construction of multiple access roads
  • Foundation preparation and clay & HDPE liner
  • Batter and foundation embankments, construction on the evaporation pond spillways, and diversion bunds

View more projects

AE-Group-Stanwell-Storage-Dam
AE-Group-MMC-Haul-Road-building
AE-Group-MMC-Gully-Rehabilitation
AE-Group-MIA-Conveyor-Construction
AE-Group-PDM-Dam-Construction
Moreton Bay Regional Council AE-Group-MBRC-Amenities-Construction
AE Group Mining Services Civil Earthworks
Citiswich Premium Industrial Estate - Bulk Earthworks
Mine Site Wash Bay Facility
Deenery Gold Poultry - Infrastructure Pads, Earthworks
Bonogin QLD Residential Subdivision - Pavement Installation
Springfield-Shopping AE Group Civil Development
Radius-Industrial-Park AE Group Civil
Round-Mountain-Reservoir AE Group Civil
Gold Coast Landfill Project - Bulk Earth Moving
Baulderstone Queensland - Civil Construction of Correctional Precinct
Wivenhoe Spillway Upgrade Project - Bulk Earthworks
Burdekin to Moranbah Pipeline Project - Dam Wall Construction
Swanbank Coal Mining Project - Excavator ROM Management

Download our Capability Statement

Our Difference

Delivering Results is Our Best Plan

We look to establish lasting relationships with our employees, clients, and suppliers by exceeding their expectations and gaining their trust through exceptional integrity, performance and reliability by all members of our teams. Our clients count on our dependability, our drive to achieve and our integrity. We take great pride in our accomplishments and building on them every day.