Results Delivered
AE Groups’ proposal recommended the utilisation of a relocatable building solution that would allow the simple movement of the structure when required as the waste facility footprint expanded in the future.
Through considered project and construction management planning, AE Group implemented the successful delivery of the Amenities Building to Council whilst maintaining a very high level of safety and environmental standards and minimising any disruption to normal services.
Key Deliverables
- Design, document, supply and construct a new 9m x 6m relocatable staff amenities building with a PWD toilet, compliant with AS1428, including connection of services and utilities
- Upgrade and renew power and comms data
- No loss time injuries
- Replace existing sewer treatment facilities and Connections
- Construct facility compliant with ISO accreditation
- Principal Contractor Management
- Traffic and Pedestrian Management Plans