Project Challenges
High mining interaction. Tight time frame.
Project Approach & Objectives
Implement a fluid traffic management plan to accommodate site production without impeding civil works. Establish stage gates to deliver the project within tight time frame. Keep safety and quality at mind.
Earthworks
- Silt Removal in Northern Culvert Outlet (2m thick)
- Excavation of Southern Culvert (1klm)
- Excavation of Northern Culvert (1klm) Excavation of road side drains (4klm)
- Detailed key trenching
- Imported materials for foundation works
- Rock protection placement
- Back-filling of bedding materials
Drainage & Structures
- Supply, transport and install 3/900 Corrugated Metal pipes
- Supply, transport and install 1/1050 Corrugated Metal Pipe
- Supply, transport and install all rock and geofabric materials for inlet and outlet chutes.