PROJECT

South West Transit Corridor (Package B & C)

SECTOR

Transport

CLIENT

Leighton Contractors

LOCATION

South West Transport Corridor

South West Transit Corridor – Package B

The corridor was built to allow for the future growth centre of Ripley and continue west to the Cunningham Highway. The corridor included a two lane road and a future dedicated public transport facility.

The project consisted of:

  • Construction of approximately 9km of new highway, with bridges and ramps at Springfield and Yamanto
  • 2.5 million cubic metres of excavation to embankments, some cuts being up to 25m deep
  • 700,000 m3 of unsuitable material were spoiled off site

South West Transit Corridor – Package C

Following the excellent project progress of the South West Transport Corridor – Package B, Leighton Contractors again awarded the bulk earthworks contract for Package C to AE Group.

Works on this section included:

  • Construction of 4.5km of two lane road to a 100km/hr standard
  • A new roundabout at South Deebing Creek Road
  • A two span bridge across Deebing Creek using 12 pre-cast concrete T-girders
  • 274,000 m2 of clearing and grubbing
  • 500,000 m3 of earthworks

With the in-situ highly dispersive soils and drought conditions at the time meant air quality was a significant issue. This challenge was met by finding several local sources of non-potable water which was used for dust suppression and embankment construction. Early investigation and proving of cut material allowed the use of existing material as special embankment fill. The placement of a plant workshop facility on site minimised down-time of earthmoving plant.

View more projects

AE-Group-Stanwell-Storage-Dam
AE-Group-MMC-Haul-Road-building
AE-Group-MMC-Gully-Rehabilitation
AE-Group-MIA-Conveyor-Construction
AE-Group-PDM-Dam-Construction
Moreton Bay Regional Council AE-Group-MBRC-Amenities-Construction
AE Group Mining Services Civil Earthworks
Citiswich Premium Industrial Estate - Bulk Earthworks
Mine Site Wash Bay Facility
Deenery Gold Poultry - Infrastructure Pads, Earthworks
Bonogin QLD Residential Subdivision - Pavement Installation
Springfield-Shopping AE Group Civil Development
Radius-Industrial-Park AE Group Civil
Round-Mountain-Reservoir AE Group Civil
Gold Coast Landfill Project - Bulk Earth Moving
Baulderstone Queensland - Civil Construction of Correctional Precinct
Wivenhoe Spillway Upgrade Project - Bulk Earthworks
Burdekin to Moranbah Pipeline Project - Dam Wall Construction
Swanbank Coal Mining Project - Excavator ROM Management

Download our Capability Statement

Our Difference

Delivering Results is Our Best Plan

We look to establish lasting relationships with our employees, clients, and suppliers by exceeding their expectations and gaining their trust through exceptional integrity, performance and reliability by all members of our teams. Our clients count on our dependability, our drive to achieve and our integrity. We take great pride in our accomplishments and building on them every day.