PROJECT

Reject Dam Cell 3 Expansion

SECTOR

Resources & Energy

CLIENT

Syntech Resources – Yancoal

LOCATION

Cameby Downs Mine

As part of the clients Operational requirements and increased production at the mine, they required an expansion to an existing tailing dam which AE constructed in 2016. A further 1.5m height was added to an active tailings co-disposal storage dam.

Reject Cell 3

Project Challenges

Raising the existing ‘live’ tailings dam wall by 1.5m and widening by 8m without any disruption to existing operations and maintaining access for mine personnel and vehicles throughout construction.

Project Approach & Objectives

Sections of the engineered embankment were required to be constructed on an alignment where “uncontrolled fill” had been placed. Significant material management and quality assurance conformance testing was undertaken on the material by the site team. Where conforming materials were identified, the works were sequenced to place suitable material directly into the fills from excavation. This approach minimised any double handling and reduced the volume of material
requiring stockpiling for reuse later.

Key Deliverables

  • Construction of a zoned water retaining engineered embankment 1.5k long (average 8m high) using different materials from three (3) borrow areas
  • Moisture conditioning and placement of this material within tight moisture tolerances
  • Haul Road development and maintenance (3km long)
  • Construction of HDPE Lined Spillway & stilling basin
  • Clean water diversion drains including culvert crossings

View more projects

AE-Group-Stanwell-Storage-Dam
AE-Group-MMC-Haul-Road-building
AE-Group-MMC-Gully-Rehabilitation
AE-Group-MIA-Conveyor-Construction
AE-Group-PDM-Dam-Construction
Moreton Bay Regional Council AE-Group-MBRC-Amenities-Construction
AE Group Mining Services Civil Earthworks
Citiswich Premium Industrial Estate - Bulk Earthworks
Mine Site Wash Bay Facility
Deenery Gold Poultry - Infrastructure Pads, Earthworks
Bonogin QLD Residential Subdivision - Pavement Installation
Springfield-Shopping AE Group Civil Development
Radius-Industrial-Park AE Group Civil
Round-Mountain-Reservoir AE Group Civil
Gold Coast Landfill Project - Bulk Earth Moving
Baulderstone Queensland - Civil Construction of Correctional Precinct
Wivenhoe Spillway Upgrade Project - Bulk Earthworks
Burdekin to Moranbah Pipeline Project - Dam Wall Construction
Swanbank Coal Mining Project - Excavator ROM Management

Download our Capability Statement

Our Difference

Delivering Results is Our Best Plan

We look to establish lasting relationships with our employees, clients, and suppliers by exceeding their expectations and gaining their trust through exceptional integrity, performance and reliability by all members of our teams. Our clients count on our dependability, our drive to achieve and our integrity. We take great pride in our accomplishments and building on them every day.