PROJECT

Oaky Creek Mine Land Rehabilitation

SECTOR

Resources & Energy

CLIENT

Glencore Oaky Creek Mine (OCC)

LOCATION

Oaky Creek

Oaky Creek Mine engaged AE Group to develop a safe and time effective method on delivering land
rehabilitation. Our aim is to return the land to a self-sustaining native ecosystem during mine operations.

AE-Group-mine-land-rehabilitation

Project Description

Through identifying, measuring, and focusing on known outcomes in earth moving, we have defined success early on in this project. Through strategic plant utilisation we are delivering safe and structurally stable landforms.

We will continue to minimise our impact on the environment through the land rehabilitation by committing to robust environmental management and performance plans.

Key Results

  • 3oo+ Hectares of mine rehabilitation
  • Design of final landforms
  • Construction and installation of drainage systems and structures
  • Design and development of push plan for mass haul
  • Removal of high and low wall voids
  • Sourcing and spreading of ameliorates and seeding (seed ratio’s)
  • Topsoil stripping and stockpile management
  • Management of dispersive / hostile materials
  • Implementation of erosion, sediment and environmental controls and adherence
  • Supply and management of geotechnical and geochemical data
  • Identify and manage project outcomes
  • Government and regulatory sign off
  • Risk assessment and management

View more projects

AE-Group-Stanwell-Storage-Dam
AE-Group-MMC-Haul-Road-building
AE-Group-MMC-Gully-Rehabilitation
AE-Group-MIA-Conveyor-Construction
AE-Group-PDM-Dam-Construction
Moreton Bay Regional Council AE-Group-MBRC-Amenities-Construction
AE Group Mining Services Civil Earthworks
Citiswich Premium Industrial Estate - Bulk Earthworks
Mine Site Wash Bay Facility
Deenery Gold Poultry - Infrastructure Pads, Earthworks
Bonogin QLD Residential Subdivision - Pavement Installation
Springfield-Shopping AE Group Civil Development
Radius-Industrial-Park AE Group Civil
Round-Mountain-Reservoir AE Group Civil
Gold Coast Landfill Project - Bulk Earth Moving
Baulderstone Queensland - Civil Construction of Correctional Precinct
Wivenhoe Spillway Upgrade Project - Bulk Earthworks
Burdekin to Moranbah Pipeline Project - Dam Wall Construction
Swanbank Coal Mining Project - Excavator ROM Management

Download our Capability Statement

Our Difference

Delivering Results is Our Best Plan

We look to establish lasting relationships with our employees, clients, and suppliers by exceeding their expectations and gaining their trust through exceptional integrity, performance and reliability by all members of our teams. Our clients count on our dependability, our drive to achieve and our integrity. We take great pride in our accomplishments and building on them every day.