Project Challenges
Live interactions within an operating mining environment including management of teams working remotely.
Project Approach & Objectives
Construct load and haul routes located within topsoil stripping areas for economical haulage and stockpile management.
Implement stringent plant maintenance schedules. Support teams and provide positive well-being incentives.
- Topsoil Strip Campaign exceeding 1 Million cubic meters
- Detailed placement of topsoil for future land rehabilitation in multiple stockpiles
- All clearing, grubbing and placement of materials as per environmental regeneration plan
- Supply of all surveyed drawings with volume movements
- Management, implementation and compliance to site Health and Safety System
- Effective team management and plant utilisation delivering our client excellent results



