PROJECT

Middlemount Mine – Mine Water Dam (MWD) Access Rd

SECTOR

Transport

CLIENT

Peabody Energy Australia

LOCATION

Middlemount Mine

Improve site access safety at Middlemount Mine by delivering and managing all services, documentation and plant required for the construction of new mine access off a state-controlled road.

AE-Group-MMC-Road-Building

Project Challenges

Live interactions with mine and public, moderate volume traffic (<500 vehicle per day). Extensive Traffic Management on a state-controlled road.

Project Approach & Objectives

  • Plan and define scope, setting out for site preparation, detailed earthworks, pavement placement and quality control
  • Delivery of all works and quality specifications as per Department of Main Roads (TMR) requirements
  • AE Group is an experienced road construction contractor holding National Prequalification status with TMR
  • Construction of basic right turn treatment (BAR)
  • Construction of channelized right turn (CHR) for MWD access road
  • The project was constructed under traffic with a high level of traffic management and interaction
  • Supply, deliver and install culverts within the road corridor
  • 2 Coat bitumen seal and line marking typical of this type of project
  • Implementation of Traffic Management Plan for State Controlled Road
  • Multilayer granular pavements
  • Significant longitudinal joints with existing pavements

View more projects

AE-Group-Stanwell-Storage-Dam
AE-Group-MMC-Haul-Road-building
AE-Group-MMC-Gully-Rehabilitation
AE-Group-MIA-Conveyor-Construction
AE-Group-PDM-Dam-Construction
Moreton Bay Regional Council AE-Group-MBRC-Amenities-Construction
AE Group Mining Services Civil Earthworks
Citiswich Premium Industrial Estate - Bulk Earthworks
Mine Site Wash Bay Facility
Deenery Gold Poultry - Infrastructure Pads, Earthworks
Bonogin QLD Residential Subdivision - Pavement Installation
Springfield-Shopping AE Group Civil Development
Radius-Industrial-Park AE Group Civil
Round-Mountain-Reservoir AE Group Civil
Gold Coast Landfill Project - Bulk Earth Moving
Baulderstone Queensland - Civil Construction of Correctional Precinct
Wivenhoe Spillway Upgrade Project - Bulk Earthworks
Burdekin to Moranbah Pipeline Project - Dam Wall Construction
Swanbank Coal Mining Project - Excavator ROM Management

Download our Capability Statement

Our Difference

Delivering Results is Our Best Plan

We look to establish lasting relationships with our employees, clients, and suppliers by exceeding their expectations and gaining their trust through exceptional integrity, performance and reliability by all members of our teams. Our clients count on our dependability, our drive to achieve and our integrity. We take great pride in our accomplishments and building on them every day.