PROJECT

Kempsey Bypass Alliance

SECTOR

Plant Hire, Transport

CLIENT

Leighton Contractors (RMS)

LOCATION

Kempsey
Kempsey-Bypasss-Alliance AE Group Civil Fleet Hire

The project scope included the design and construction of 14.5km of four-lane divided highway from Kempsey to Frederickton having more than 2.5 Million cubic meters of material to remove.

Plant utilised were PC1100, PC850 and PC710 Excavators with a fleet of 11 Komatsu 50T Rear Dump Trucks and 50T Water carts. AE 16H Graders and Compactors were utilised in the bulk earthworks crews for haul road maintenance and management of fills. Large Komatsu 475 and 375 Dozers were utilised in the primary cuts for material management in conjunction with the drill and blast contractor.

The large volumes of material hauled up to 9km through the project required our fleet to interact extensively with other construction traffic and was achieved without incident and to the satisfaction of our client.

Our excellent safety record combined with our late model equipment has meant that we remain the Contractor of choice for Leighton and we are proud to continue our long standing relationship with them on numerous projects throughout Queensland and New South Wales.

  • 14.5km of four-lane dual carriageway
  • Construction of major interchanges at Kempsey and Frederickton
  • 2.6 million cubic metres of earthworks
  • 1 million cubic metres of blasting material to be placed

“We engaged AE Group on the Kempsey Bypass Alliance as a major earthmoving plant company providing the services of wet hire plant, maintenance and professional advice on earthmoving.

During the 18 month period on the project, AE Group’s management acted professionally, supporting our key values around safety, environment, community and quality. They provided a collaborative approach in dealing with issues.

We would highly recommend the services of AE Group for future earthmoving projects.”

Chris Davis, Roadworks Manager – Leighton’s Representative

View more projects

AE-Group-Stanwell-Storage-Dam
AE-Group-MMC-Haul-Road-building
AE-Group-MMC-Gully-Rehabilitation
AE-Group-MIA-Conveyor-Construction
AE-Group-PDM-Dam-Construction
Moreton Bay Regional Council AE-Group-MBRC-Amenities-Construction
AE Group Mining Services Civil Earthworks
Citiswich Premium Industrial Estate - Bulk Earthworks
Mine Site Wash Bay Facility
Deenery Gold Poultry - Infrastructure Pads, Earthworks
Bonogin QLD Residential Subdivision - Pavement Installation
Springfield-Shopping AE Group Civil Development
Radius-Industrial-Park AE Group Civil
Round-Mountain-Reservoir AE Group Civil
Gold Coast Landfill Project - Bulk Earth Moving
Baulderstone Queensland - Civil Construction of Correctional Precinct
Wivenhoe Spillway Upgrade Project - Bulk Earthworks
Burdekin to Moranbah Pipeline Project - Dam Wall Construction
Swanbank Coal Mining Project - Excavator ROM Management

Download our Capability Statement

Our Difference

Delivering Results is Our Best Plan

We look to establish lasting relationships with our employees, clients, and suppliers by exceeding their expectations and gaining their trust through exceptional integrity, performance and reliability by all members of our teams. Our clients count on our dependability, our drive to achieve and our integrity. We take great pride in our accomplishments and building on them every day.