Project Challenges
Working on a LIVE TSF required our construction program for sequencing and timeframes to be on point. Due to the
nature of TSF’s walls and potential failures, our team safety completed the project adhering to stringent health, safety
and design protocols.
The successfully construction of a buttress bench and remediation works, AE Group have been able to minimise further
potential risks and deliver a cost-effective solution whilst increasing BHP’s social value.
Key Results
- Remediation of existing / Live tailings dam
- Rehabilitation of deep scours and surrounding landscapes
- Construction of certified zoned embankment (up to 14m high)
- Tie-in to existing live tailings dam
- Topsoiling management and application
- Scarify rehabilitated tailings dam
- Cultural Heritage Management
- Cultural Heritage Management
- Safety and environmental management plans for compliance with project specific approvals
- Bulk earthworks and excavation including fill and rock protections
- Management of certified geo-technical testers for compliance
- Sub contractor management of gypsum and hydro-seeding