Project Challenges
Through planned communication, an essential tool, we achieved productivity and maintained strong working relationships at all levels of BHP including land and stakeholders. The project was successfully delivered, and all works were performed the under contract in accordance with BHP’s Contractor Management System (CMS) including
compliance with BHP’s safety health and management system.
Key Results
- Excavation and land formation of Northern diversion drain (2km)
- Excavation and land for Central diversion drain (1km)
- Excavation and land for Southern diversion drain (1km)
- Construction of dam head walls, aprons and wing walls on SD1+2 Drain
- Foundation stripping of diversion bund (2km)
- Key trenching diversion bund (2km)
- Supply and install of all associated spillways and rock protection
- Key trench Southern diversion bund (2km)
- Supply and install of all associated spillways and rock protection
- Relocation of the Eungella Pipeline
- Topsoil stripping and stockpile management
- Clearing and grubbing (2ha)
- Survey set out of works and supply of as-built drawings
- Management and supply of all ITP’s and controls