Project Approach & Objectives
Our plan, identify any specific or potential environmental protection measures required to mitigate risk before project
start. As a team we achieved zero harm throughout the project and compliance with all BHP, BMA and AE Group
company rules, procedures and standards.
Through detailed earthworks and material placement, all stringent geotechnical testing was achieved.
Diligent planning, organisation and management of people and plant enabled us to achieve and deliver on all project
deliverables.
Key Results
- TSF embankment raise 450,000m3
- Civil construction of spillways and drainage basins
- Design and construct new service and access roads
- Install new tailings delivery pipes
- Installation of new TSF monitoring systems
- Environmental management and compliance
- Development and implementation of all project management plans
- Design, supply and install erosion and sediment controls
- Key trench Southern dam wall
- Supply and install of all associated spillway and rock protection
- Topsoil stripping and stockpile management
- Survey set out of works and supply of as-built drawings
- Management and supply of all ITP’s and QA controls
- Seeding and Hydro mulching
- Identification and mitigation of risks and hazards
- Construction and maintenance of access and haul roads