- 900,000m2 Clearing
- 850,000m2 topsoil removal
- 1.2 Million Cut to Fill – Level 1 Supervision
- Working with Cultural Heritage & Wildlife monitors
- 2ML of water consumption per day includes pumping water 5km
- 5 kilometres of drainage systems
- 2 x 25ML HDPE Lined water retention basins
- 6 kilometres of main roads built to QLD Main Roads Specifications
- Construction of HDPE Lined waste water and evaporation ponds
We engaged AE Group to undertake the civil works for stage one of a new correctional facility located at Gatton. Works carried out by AE and their network of subcontractors included site clearing, drainage, pavements, rock blasting, soils testing and bulk earthworks using their extensive fleet of earthmoving equipment.
Throughout the project they showed excellent management of their subcontractors and worked well to deliver solutions to challenges faced. They established good communications, and despite the requisite challenges, we enjoyed a good working relationship from project commencement to completion.
David Forgan, Project Manager