PROJECT

600ML Dam Burdekin to Moranbah Pipeline

SECTOR

Construction

CLIENT

McConnell Dowell

LOCATION

Burdekin
Burdekin to Moranbah Pipeline Project - Dam Wall Construction

The project comprised:

  • 60,000m3 topsoil stripping of dam footprint and borrow areas with 631E scraper fleets
  • 150,000 m3 unsuitable material to stockpile
  • Treatment of foundation ready for placement of conditioned clay materials
  • 300,000m3 of clay borrow material for dam wall construction including excavation load haul and placement on a rotating 24/7 roster
  • Conditioning of materials carried out using irrigation methods 24 hours per day
  • 200,000m3 of zoned material for dam wall including excavate, load & haul

We wish to thank you and your team for the outstanding effort and dedication to excellence on the 600ML Balancing Storage Project on the Burdekin to Moranbah Pipeline. Both my superiors and I were continually surprised and delighted with the professionalism and dedication to quality that your team displayed during the project. With an original duration of 25 weeks, and subsequent additional works your company managed to bring the project to completion in less than 16 weeks, an outstanding effort.

Jim Campbell – Construction Manager – Burdekin Pipeline

View more projects

AE-Group-Stanwell-Storage-Dam
AE-Group-MMC-Haul-Road-building
AE-Group-MMC-Gully-Rehabilitation
AE-Group-MIA-Conveyor-Construction
AE-Group-PDM-Dam-Construction
Moreton Bay Regional Council AE-Group-MBRC-Amenities-Construction
AE Group Mining Services Civil Earthworks
Citiswich Premium Industrial Estate - Bulk Earthworks
Mine Site Wash Bay Facility
Deenery Gold Poultry - Infrastructure Pads, Earthworks
Bonogin QLD Residential Subdivision - Pavement Installation
Springfield-Shopping AE Group Civil Development
Radius-Industrial-Park AE Group Civil
Round-Mountain-Reservoir AE Group Civil
Gold Coast Landfill Project - Bulk Earth Moving
Baulderstone Queensland - Civil Construction of Correctional Precinct
Wivenhoe Spillway Upgrade Project - Bulk Earthworks
Burdekin to Moranbah Pipeline Project - Dam Wall Construction
Swanbank Coal Mining Project - Excavator ROM Management

Download our Capability Statement

Our Difference

Delivering Results is Our Best Plan

We look to establish lasting relationships with our employees, clients, and suppliers by exceeding their expectations and gaining their trust through exceptional integrity, performance and reliability by all members of our teams. Our clients count on our dependability, our drive to achieve and our integrity. We take great pride in our accomplishments and building on them every day.