PROJECT

Foxleigh Topsoil Strip & Land Rehabilitation

SECTOR

Resources & Energy

CLIENT

Middlemount South – Foxleigh Mine

LOCATION

Middlemount

AE Group partnered with an experienced rehabilitation consultant to provide strategic assistance in the optimisation of rehabilitated land forms which assisted in reducing overall timelines and costs. This process allowed us to provide a quality product that exceeded the EA requirements for the mine.

AE Group Dozer at Foxleigh Mine Topsoil Strip and Land Rehabilitation

Through working collectively with the Environmental Department, we established rehabilitation objectives, targets and success criteria. With this information we were able to optimise the design and develop a detailed mass haul, subsequently, decreasing construction duration and cost.

Overall, we reduced the cut to fill reshaping required and increasing the productivity of the construction fleet while
expanding the landform surface area of the mine rehabilitation.

Key Results;

  • Topsoil strip and stockpile for mine pit expansion
    (250,000m3)
  • Progressive rehabilitation of spoil dump
  • 650,000m3 cut to fill dozer push
  • 90 Hectares mine land rehabilitation
  • 180,000m3 topsoil placement
  • Topsoil strip and stockpile for new levee construction
    (180,000m3)
  • 90 Hectares of hydroseeding

 

View more projects

AE-Group-Stanwell-Storage-Dam
AE-Group-MMC-Haul-Road-building
AE-Group-MMC-Gully-Rehabilitation
AE-Group-MIA-Conveyor-Construction
AE-Group-PDM-Dam-Construction
Moreton Bay Regional Council AE-Group-MBRC-Amenities-Construction
AE Group Mining Services Civil Earthworks
Citiswich Premium Industrial Estate - Bulk Earthworks
Mine Site Wash Bay Facility
Deenery Gold Poultry - Infrastructure Pads, Earthworks
Bonogin QLD Residential Subdivision - Pavement Installation
Springfield-Shopping AE Group Civil Development
Radius-Industrial-Park AE Group Civil
Round-Mountain-Reservoir AE Group Civil
Gold Coast Landfill Project - Bulk Earth Moving
Baulderstone Queensland - Civil Construction of Correctional Precinct
Wivenhoe Spillway Upgrade Project - Bulk Earthworks
Burdekin to Moranbah Pipeline Project - Dam Wall Construction
Swanbank Coal Mining Project - Excavator ROM Management

Download our Capability Statement

Our Difference

Delivering Results is Our Best Plan

We look to establish lasting relationships with our employees, clients, and suppliers by exceeding their expectations and gaining their trust through exceptional integrity, performance and reliability by all members of our teams. Our clients count on our dependability, our drive to achieve and our integrity. We take great pride in our accomplishments and building on them every day.