PROJECT

Oaky Creek North (OCN) Drainage Levee

SECTOR

Resources & Energy

CLIENT

Glencore Oaky Creek Mine North

LOCATION

Oaky Creek

The management of surface, groundwater and Mine Affected Water (MAW) is a key consideration in achieving mining operation success.

AE Group Scraper on drainage levee project

Results Delivered

Our objective on the Oaky Creek North Drainage Levee was to capture MAW from the Oaky Creek North main industrial and hardstand areas.

Through considered planning and utilisation of current landforms, we developed a series of clean and MAW catchment drains with construction of a new pollution pond at the southern end of the catchment. With dedicated separation drains and spillways we have successfully managed water runoff.

All works were undertaken safely and in accordance with all Oaky Creek North Mine and statutory safety requirements.

Key Deliverables

  • Management of spoil and topsoil stockpiles
  • Clearing and grubbing
  • Excavation of existing catchments and drains
  • Removal of dispersive / hostile materials
  • Construction of embankment foundations and key trenching
  • Establishing and maintaining on-site borrow pit and material areas
  • Supply and installation of erosion protection works including rock chutes
  • Construction of the pollution pond spillways
  • Construction and install of concrete sills and erosion protection
  • Adherence and compliance to geo-technical specifications and environmental controls
  • Management and supply of all as-constructed, inspection and survey data

View more projects

AE-Group-Stanwell-Storage-Dam
AE-Group-MMC-Haul-Road-building
AE-Group-MMC-Gully-Rehabilitation
AE-Group-MIA-Conveyor-Construction
AE-Group-PDM-Dam-Construction
Moreton Bay Regional Council AE-Group-MBRC-Amenities-Construction
AE Group Mining Services Civil Earthworks
Citiswich Premium Industrial Estate - Bulk Earthworks
Mine Site Wash Bay Facility
Deenery Gold Poultry - Infrastructure Pads, Earthworks
Bonogin QLD Residential Subdivision - Pavement Installation
Springfield-Shopping AE Group Civil Development
Radius-Industrial-Park AE Group Civil
Round-Mountain-Reservoir AE Group Civil
Gold Coast Landfill Project - Bulk Earth Moving
Baulderstone Queensland - Civil Construction of Correctional Precinct
Wivenhoe Spillway Upgrade Project - Bulk Earthworks
Burdekin to Moranbah Pipeline Project - Dam Wall Construction
Swanbank Coal Mining Project - Excavator ROM Management

Download our Capability Statement

Our Difference

Delivering Results is Our Best Plan

We look to establish lasting relationships with our employees, clients, and suppliers by exceeding their expectations and gaining their trust through exceptional integrity, performance and reliability by all members of our teams. Our clients count on our dependability, our drive to achieve and our integrity. We take great pride in our accomplishments and building on them every day.