The scope includes clearing and grubbing of all areas, roads, poultry shed and ancillary infrastructure pads earthworks (to Level 1), stormwater drainage / management structures, pavements and landscaping as specified.
The construction of eight sheds, which will eventually house 352,000 birds at a time six times a year, is expected to begin soon after the civil construction is completed.

