PROJECT

Oaky Creek Coal (OCC) Turkey Nest

SECTOR

Resources & Energy

CLIENT

Glencore Oaky Creek Mine (OCC)

LOCATION

Oaky Creek

In order to reduce loss of water and to stop ground water contamination, Oaky Creek mine required a designated water storage dam / turkey’s nest to assist in achieving underground mining safety
protocols in the event of a fire.

Turkey Nest for Water Storage - HDPE Lining

Results Delivered

The successful management of water is key to OCC mining operations and safety. After identifying site suitable areas and managing strict design criteria, piped inlet structures were designed and installed to regulate any potential surges from high water run off events.

HDPE liner was also installed to further enhance the design criteria, reduce erosion and allow for ease of scheduled maintenance. All design and construction objectives have been meet and complies with OCC’s emergency water storage plans.

Key Deliverables

  • Identify site suitable area
  • Excavation and disposal of unsuitable material
  • Importing and placement of dam suitable materials
  • Sub contractor management for install of HDPE liner
  • Compaction and soil testing management
  • Supply and install heavy duty perimeter fencing
  • Supply and install concrete slabs, foundations of pump house and thrust blocks
  • Supply of as built excavation, as-constructed and compaction testing

View more projects

AE-Group-Stanwell-Storage-Dam
AE-Group-MMC-Haul-Road-building
AE-Group-MMC-Gully-Rehabilitation
AE-Group-MIA-Conveyor-Construction
AE-Group-PDM-Dam-Construction
Moreton Bay Regional Council AE-Group-MBRC-Amenities-Construction
AE Group Mining Services Civil Earthworks
Citiswich Premium Industrial Estate - Bulk Earthworks
Mine Site Wash Bay Facility
Deenery Gold Poultry - Infrastructure Pads, Earthworks
Bonogin QLD Residential Subdivision - Pavement Installation
Springfield-Shopping AE Group Civil Development
Radius-Industrial-Park AE Group Civil
Round-Mountain-Reservoir AE Group Civil
Gold Coast Landfill Project - Bulk Earth Moving
Baulderstone Queensland - Civil Construction of Correctional Precinct
Wivenhoe Spillway Upgrade Project - Bulk Earthworks
Burdekin to Moranbah Pipeline Project - Dam Wall Construction
Swanbank Coal Mining Project - Excavator ROM Management

Download our Capability Statement

Our Difference

Delivering Results is Our Best Plan

We look to establish lasting relationships with our employees, clients, and suppliers by exceeding their expectations and gaining their trust through exceptional integrity, performance and reliability by all members of our teams. Our clients count on our dependability, our drive to achieve and our integrity. We take great pride in our accomplishments and building on them every day.