PROJECT

Dozer Push and Rehab Works

SECTOR

Resources & Energy

CLIENT

Peabody Energy Australia

LOCATION

Middlemount Mine

AE GROUP Civil & Mining understands the requirements and the legislative compliance in delivering rehabilitation projects within the mining sector. We have successfully been operating on major dozer push and rehabilitation project for Middlemount Mine in which AE Group consistently exceeded their safety and production targets.

Middlemount Mine - D10 & D12 Resources & Energy Project

Our company possess the capabilities to manage the risks associated with rehab works and deliver the outcomes required by the Mining Legislation through:

  • Undertaking certain activities as directed by Mine Management.
  • Levelling the surface and otherwise restore the land to its original condition.
  • Reinstatement and reforming of drainage lines, waterways and creek beds to stable and natural contours.
  • Shaping the area so that it conforms with the surrounding topography.
  • Achieving a post mining land use capability across  the lease area.

Throughout 2017 – 2020 we have completed multiple Bulk Dozer Push campaigns, Coal Uncovering Works, Strip Waste Management, Establish High Wall Ramps, Drill Bench Preparation, Ancillary Tasks and Day works as requested utilising our D11 Dozers and PC1250 Excavator fleets.

Our expertise in rehabilitation capabilities include, but are not limited to:

    • Clear and Grub of Greenfield Sites
    • General Mine Maintenance
    • Site Rehabilitation
    • Stabilisation of existing land forms
    • Complex earthworks / earth moving including guide banks and rock mulching
    • External and downstream spillway drains and culverts
    • Decontamination
    • Spoil dams too meet compliance
    • Vegetation regrowth through top-soiling, grass seeding and hydro mulching within zoned perimeter embankments

Our extensive experience in the Black Coal industry enables us to provide innovative and cost-effective contract mining solutions to our clients.

AE Group’s pre-strip fleet and experienced workforce facilitate quick mobilisation times and extend to a strong understanding of Pre-strip and Topsoil removal processes and quality service that is renowned throughout the industry.

 

 

View more projects

AE-Group-Stanwell-Storage-Dam
AE-Group-MMC-Haul-Road-building
AE-Group-MMC-Gully-Rehabilitation
AE-Group-MIA-Conveyor-Construction
AE-Group-PDM-Dam-Construction
Moreton Bay Regional Council AE-Group-MBRC-Amenities-Construction
AE Group Mining Services Civil Earthworks
Citiswich Premium Industrial Estate - Bulk Earthworks
Mine Site Wash Bay Facility
Deenery Gold Poultry - Infrastructure Pads, Earthworks
Bonogin QLD Residential Subdivision - Pavement Installation
Springfield-Shopping AE Group Civil Development
Radius-Industrial-Park AE Group Civil
Round-Mountain-Reservoir AE Group Civil
Gold Coast Landfill Project - Bulk Earth Moving
Baulderstone Queensland - Civil Construction of Correctional Precinct
Wivenhoe Spillway Upgrade Project - Bulk Earthworks
Burdekin to Moranbah Pipeline Project - Dam Wall Construction
Swanbank Coal Mining Project - Excavator ROM Management

Download our Capability Statement

Our Difference

Delivering Results is Our Best Plan

We look to establish lasting relationships with our employees, clients, and suppliers by exceeding their expectations and gaining their trust through exceptional integrity, performance and reliability by all members of our teams. Our clients count on our dependability, our drive to achieve and our integrity. We take great pride in our accomplishments and building on them every day.