Some of our projects completed in 2017 have been:
- ROM Extension project
- South Dump Rehab Works
- Dozer Mining / Push
- New pads for Main Crib Hut and Workshop
- North Dump Rehab Works
- Haul Road Maintenance
- Exploration Drill Pad Preparation, and much more!
Key environmental mine rehabilitation deliverables
- Desilting of numerous sediment dams
- Repairs to Mine Water Dam
- Vital maintenance on 13 Mile Gully Diversion
- Over 25 Hectares of Dump Rehab works and rejuvenation
The works at the North Dump batter required significant planning and methodology to ensure a safe and productive outcome was achieved and to eliminate risk to persons and plant from bogging in the very wet conditions encountered. Depth of the wet material around the toe of the dump was between 2-3 metres deep.
For reference, the haul road is 40m wide and the mud where its coming out of the bunds is up to 1m deep.